About this project:
Client
Anonymous
Construction year
2024

We received a request to create a construction for a gangway, with the drawings already prepared, allowing us to start manufacturing immediately. For the other construction, we had only 1.5 weeks, also for a gangway, which needed to be made on an existing construction. This gangway had to rotate partially and move longitudinally along the gangway. The design and calculations were also provided by us. It had to be easy to assemble, so that it could be installed with as few modifications as possible to the current structure. After approval of an initial concept and calculations, we immediately started with the construction.

Thanks to the short communication lines with our suppliers, we were able to act quickly and deliver the product within the deadline.